AZ Tooling Standards Check-Off Sheet 
Refer to
www.
azautomotive
            .com
AZ Representative(s):  
Date of first evaluation:
Tool description:
Tooling
Standards
Reference
  OK Variance allowed
 SECTION 1.0
 GENERAL REQUIREMENTS:
NG N/A x
           
1.1.1. Complies with references.        
1.1.2. Warrantee is defined by the statement of requirements.        
1.1.5. Operation manual available 15 days prior to installation at AZ?        
1.1.6. Cycle time based on statement of requirements.        
1.2.1 Have status reports been submitted to AZ weekly?        
1.3.1. Power, air  volume, water and gas requirements provided to the AZ Manufacturing Engineer?        
1.3.3. Components on AZ approved standard components list?        
1.3.5 New drawing package is complete?        
1.3.10. Have drawings be updated to reflect all changes?        
1.5.1. Spare parts listing supplied to Manufacturing Engineer        
1.6.1. Breakdown (shipping) points ID.        
1.6.2. Air, water and oil lines drained and plugged before shipment.        
1.7.1. Guarding and protection provides adequate safety.